Home » Industry News » Industrial Cooling Tower Water Treatment

Industrial Cooling Tower Water Treatment

Chardon Laboratories is your best supply for reliable cooling tower chemical treatment companies. We are going to work with you to develop a personalized cooling tower chemical treatment plan that will provide an efficient defense against key contamination points such as biological progress, concentrated mineral content and white rust formation. You’ll get the benefit of a assured scale-free cooling tower water treatment system at a assured annual worth.

Overview of Our Cooling Tower Water Treatment Merchandise

Our advanced cooling tower water treatment services embody the precise utilization of our superior cooling tower inhibitor product line. Now we have developed merchandise which are specifically designed to deal with each particular condition that could lead to contamination. As an illustration, some products will eliminate scale in cooling towers with laborious, alkaline make-up water, whereas others will stop corrosion in methods with smooth or low TDS make-up water. Our effectively-trained, skilled ISO-certified technicians have the experience to pick and apply the appropriate water remedy chemicals in your unique cooling tower maintenance requirements.

Effective Cooling Tower Treatment for brand spanking new System Startup

The startup of a brand new cooling system is a critical period in its lifecycle. Chardon Labs gives cooling tower treatment for new systems with two clear goals in mind: thorough cleansing and correct passivation. Throughout the equipment cleaning phase, we use cooling tower chemical treatment merchandise that may take away in-transit oxidation, clean out corrosion by-products and eradicate oils and grease from producer preparations. The purpose is to ensure all system components are thoroughly flushed to forestall contamination.

Upon completion of the cleansing phase, the next step is passivation, which is a process designed to render element surfaces unreactive through the application of chemicals. There are completely different passivates designed for various cooling tower systems. Your Chardon Labs technician has the expertise to recommend the best cooling tower chemical treatment to your needs.

Our Cooling Tower Chemical Treatment Providers Also Embody Heat Exchangers

A cooling tower’s heat exchanger permits heat to flow via a fabric, often a stainless steel plate or copper tube, from the hot aspect to the cool facet. Scale, usually in the type of calcium carbonate, can accumulate on the surface of the exchanger and act as an insulator that reduces its efficiency. Our water treatment chemicals are the simplest heat exchanger cleaning merchandise at the moment in the marketplace. We use advanced chemistry for the best cleaning. Corrosion inhibitors and dispersants make sure the metal is protected and post-cleansing fouling does not happen. Your Chardon Labs technician can also apply additional merchandise for sure heat exchanger cleansing functions as wanted.

Contact Our Cooling Tower Chemical Treatment Company to Be taught Extra

Contact our cooling tower water treatment company for more details about these and other out there cooling tower services.

Premier Cooling Tower Treatment

Cooling towers can range in dimension from fairly modest to extremely large, depending on the cooling loads of a facility. Chardon handles them all, and will tailor a maintenance program to meet your specifc needs. Due to it’s exposure to the surface environment, the cooling tower is the primary source of contamination inside your system. Appearing as a big air washer, the “opentower water loop accumulates airborne particulate and promotes biological development. By means of evaporation, it also concentrates mineral content material. Chardon makes use of a full line of corrosion and scale inhibitors, white rust preventatives, and microbiological inhibitors to create a customized chemical plan that addresses these problems and others to maintain your cooling towers operating efficiently.

Cooling Tower Loop

Water is carried from the condenser to the cooling tower, where it’s floor space is increased to facilitate evaporation. A few of the water is misplaced within the environment, but the solids stay behind. When the cooled water reaches the sump, it is circulated back by the condenser, where it removes heat from the refrigerant.

Refrigerant Loop

Refrigerant is repeatedly cycled through the refrigerant loop. It absorbs heat from the chilled loop and is changed from a liquid to a gasoline in the evaporator. The compressor will increase the stress and temperature of the gas, which flows into the heat exchanger. There, the cooling tower water removes heat from the refrigerant inflicting it to condense again to a liquid.

Chilled water Loop

The chilled loop is definitely a closed loop where water is circulated all through the entire facility repeatedly to meet the cooling requirements of the system.

“We don’t promote chemicals, we promote clear systems./h2>

Cooling tower treatment

Overview of the Chardon Cooling Tower Inhibitor Product Line

What is the Chardon Cooling Tower Inhibitor Product Line? Chardon cooling tower treatment utilizes a wide range of cooling tower scale and corrosion inhibitors. Every product has attributed designed to address totally different circumstances. Some products are designed to stop scale in systems with extraordinarily hard, alkaline make-up water. Others are designed to regulate corrosion in programs with very tender, or low TDS make-up water. Nobody product will handle all circumstances. The Chardon Cooling Tower Inhibitor Line provides our Prospects with the finest in chemical remedy products.

Is there something particular I must find out about utilizing these products? Solely trained professionals comparable to your Chardon Service Technician should handle and apply water remedy products. Please use care in handling all chemical treatment merchandise and at all times put on the beneficial personal protective equipment. Seek advice from the SDS for complete security and first help precautions.

How do I test for these products in my cooling tower? The steady refinement of testing methods has driven the event of latest inhibitor products and in concert with proper product selection, accurate testing is the important thing to efficiency. Most Chardon inhibitor products are designed to function at 50 ppm. The Chardon Inhibitor System is the correct place to begin when setting up a brand new chemical feed program. Once the cooling tower has cycled up and reached equilibrium, we test the focus of the tracer identified.

Start Up of Cooling Towers Cooling Tower Treatment

Overview: The startup of a new system is an important time within the life cycle of a system. Chardon Laboratories understands that it’s vitally necessary to correctly clean and passivate the techniques to insure glorious protection, lengthy life, and proper operation of the gear. The procedures themselves are straight ahead, the challenge comes from the power to implement them at the right time and the right order. New construction websites have many different demands and time tables than a far easier gear upgrade job. Depending on the site timetable loops might begin earlier than condenser techniques, condenser programs might begin with out chillers in place but, techniques may begin up, then sit idle afterwards for durations of time until really operating with load, totally different manufacturers may have completely different advisable procedures or none at all. Chardon is able to handle these points and make general suggestions for the perfect way to properly passivate and protect methods underneath these and different various conditions.

Normal Overview: Chardon has two main goals in startup chemical therapy. The primary is to wash the methods. The metals within the elements develop corrosion by-merchandise throughout shipping and set up. Despite the manufacturers greatest efforts to guard the elements throughout this time interval, some oxidation and corrosion occur. Some of the safety methods truly introduce supplies that have to be eliminated before operation. A particular example can be the oil coating on new steel pipe. Debris can also be introduced into the elements throughout actual building. The second goal is to passivate the assorted metallic surfaces to minimize future corrosion. Let’s have a look at each of those in additional element.

tower the hybrid cell type cooling tower offers efficient cold water ...

Cleaning: Chardon’s first step is to wash the equipment. We add chemical merchandise to the system which might be designed to take away in transit oxidation, clean out corrosion by-products, and clean out oils and grease from producer preparations. We additionally add biocides that can kill any micro-organisms that could be in the parts already. During this phase the methods are full of water after which circulated with water and the chemicals through the entire system for not less than 48 hours to insure a radical cleaning of all elements. At the tip of that time, the system needs to be thoroughly flushed until the water in the system is clean. One of the best method is to open low level drains all through the system to flush any heavy debris out, then go away open low point drains adequate to purge the system with out over working the makeup functionality of the system. The system pumps must be left working at this point to circulate water by the system yet. It’s best to flush the system on this manner to get a good elimination of all debris. When the system has turned over approximately 5 times the amount and the water exams out clear, any start up strainers ought to then be removed, and cooling towers should be drained and washed out. The important thing to all of this is to ensure that All the system components get flushed. If this isn’t possible as a result of timetable constraints, then the tools that does not receive a flush, have to be flushed individually prior to coming on line to forestall attainable contamination of already cleaned parts.

Passivation: The following step is passivation. Condenser water parts are already passivated from the cleansing chemical, with the doable exception of the tower. There are totally different treatments for various techniques, and your Chardon Representative will decide the correct one. The essential thing is to add them in straight away, and circulate them throughout your complete system. The sooner they go in after flushing the higher. Cooling towers may require additional special chemical remedy for a longer period if they’ve galvanized components. The galvanizing requires extended passivation to prevent the formation of white rust.

Condenser Techniques/Towers: These components are cleaned and passivated at the identical time by the addition of Chardon’s advisable chemicals and biocides. As mentioned before, they should be circulated for at the least 48 hours, then flushed. Again, it is crucial to be sure that All the elements get this therapy. Open all valves and zones to make sure complete circulation. Any and all chillers, towers, pumps and piping need to have circulation by means of them. If for some reason, not all elements can be flushed right now, they ought to be flushed individually before being put on line. The towers ought to be drained and washed out after the flush, and start up strainers eliminated. The flush is completed when phosphate and iron levels within the water strategy 0.Three ppm or much less and the conductivity of the flush water equals that of the make-up water. If the towers have galvanized elements, the required treatment should be in place to begin treating for white rust upon completion of the flush.

Cleaning Heat Exchangers

The place does scale come from? Scale is available in quite a lot of forms, however the most typical is calcium carbonate, or CaCO3. Calcium scale precipitates when the threshold solubility of calcium and carbonate is exceeded. Calcium and alkalinity exist in several concentrations in just about all make-up sources. As evaporation removes pure water from the cooling tower, the dissolved solids remaining enhance in focus. If the concentration turns into too great, the combine to type calcium carbonate scale.

How is this often controlled? Stopping scale formation is a mix of controlling cycles of concentration and modifying the solubility of calcium carbonate with chemical threshold inhibitors or different means. By knowing the threshold solubility, or the focus at which scale begins to form, we are able to control the situations at a protected margin below this point. It is a elementary principle of cooling tower treatment.

How do I know if cleansing is critical? Heat exchangers allow heat to flow via a material, generally a copper tube or stainless steel plate, from the hot facet to the cool side. Scale or any other materials that accumulates on the heat alternate surface acts as an insulator and reduces the efficiency of the heat exchanger. Most heat exchangers are designed to operate at a particular temperature range called T (Delta T). The T describes the distinction between the temperature going into and popping out of the heat exchanger. A reduction in the T is a sign of a reduction in heat switch efficiency. This is typically due to scale formation, microbiological fouling or mud settling in or on the tubes.

Which product does Chardon use for the cleaning? Chardon Scalzo is the simplest product for cleaning heat exchangers, though some require special merchandise. Scalzo incorporates chemistry for the best cleaning, plus corrosion inhibitors and dispersants to make sure the metallic is protected and submit-cleansing fouling does not occur. Scalzo just isn’t recommended for some materials, stainless steel in particular. Please seek the advice of your Chardon Consultant of chemical recommendations.

Stopping Corrosion and Fouling Throughout Lay Up

Why does the Chardon cooling tower treatment program stress the importance of “laying upmy cooling tower? If left to develop unchecked, the micro organism that stay in your cooling tower will colonize pipe and different wetted surfaces. Over time these colonies will develop into thick biofilms that scale back heat switch, stop corrosion inhibition methods, and even cause corrosion. Cooling tower water commonly support large populations of micro organism and algae. Air pulled by means of the tower comprises particulates and people particulates harbor microbes. The cooling tower scrubs the particulates out of the air and the water presents the microbes a spot to develop and multiply. The water might look clear, however microbe counts as excessive as one million or extra cells per milliliter can thrive in cooling tower water. That’s up to a trillion bacteria in 1,000 gallons of tower water!

How much bacteria is an excessive amount of? The Cooling Tower Institute, ASHRAE, Chardon and other professional organizations have recognized a inhabitants stage of 105 cfu/ml* or lower as environment friendly. Micro organism are over 98% water and do not affect evaporation or heat switch as free floating cells. When the inhabitants exceeds the carrying capacity of the setting, micro organism secrete a coat of extracellular polymer, better known as slime. This slime traps other particulates, harbors each residing and useless micro organism, and finally grows into a fancy community knows as biofilm. Biofilm has an insulating effect on heat switch, can clog piping and reduce movement charges, and may promote corrosion beneath the biofilm by a variety of mechanisms. If left to develop out of control, biofilm will assist wealthy, advanced communities that will embrace multicellular organisms corresponding to rotifers and roundworms.

What are the problems with biofilm in my system? Biofilm kinds a boundary between the water and the copper and steel in your tower and heat exchangers. Chardon has found that this boundary reduces heat transfer effectivity. In fact, biofilm creates much more heat transfer problems than calcium scale. Biofilm also prevents corrosion inhibitors from reaching the base steel. Biofilm can harbor Legionella and other doubtlessly dangerous species. Microbiologically influenced corrosion, or MIC, can occur within biofilm and attack tube sheets, end bells, and other system elements which are protected during normal tower operation. Biofilm also
supports below-deposit corrosion that can weaken metallic parts and shorten tools life.

What about algae? Chardon knows that algae might be an issue in cooling towers the place a major amount of sunlight reaches the water. Very like bacteria although, slightly algae within the sun lit parts of a cooling tower does not cut back evaporation or heat transfer. Thick mats of algae can promote under-deposit corrosion and harbor different damaging bacteria. Lengthy strands of algae that break free can clog strainers or other nice orifices in your system. Algae dies shortly once it breaks freed from its hold within the solar and flows into the darkness of a piping system. Lifeless algae decomposes and can provide nutrients for bacterial communities, however the main influence of algae is the clogging of intake screens and different strainers in the system.

How can I prevent biofilm in my system? One of many goals of Chardon’s cooling tower treatment program is to manage the inhabitants of micro organism at or below the recommended degree of 105 cfu/ml. Most micro organism will not be inherently harmful, but dangerous things can occur after they grow out of control. It is vital to understand that we encounter these bacteria on daily basis when respiration the air around us, touching countertops or sinks, or working in soiled areas. There are no dangers at very low exposure ranges. Holding bacteria populations at or beneath the 105 cfu/ml level will stop biofilm formation. Chardon chemical therapy packages use biocides to manage micro organism.

What happens when my system is off line? Your gear is protected by Chardon’s cooling tower treatment whereas it’s on line and working, but what about during short-term shut downs or the off season? Bacteria develop exponentially; that is, one cell divides to type two cells, these two divide to kind four, then eight, then sixteen, and so forth. If left unchecked, micro organism will multiply and start forming biofilm.

What can I do to stop biofilm when my system is off line? Following an accepted layup process is the best observe. Chardon’s best observe for defending programs during seasonal or long term layup is to drain condensers and heat exchangers as soon after shut down as possible. Microbiological fouling can proceed rapidly and the cleaning and inspection shall be simpler when performed soon after shut down. First cycle the system down to assist flush out particulates, then circulate a product equivalent to Chardon’s CT Lay-up. An air tight desiccant layup program should be thought of for longer durations of inactivity.

What if I CAN’T drain my system? Cooling tower systems that function intermittently through the cooler months will have biofilm problems and the problems might be extreme if operation only happens for a few hours per week. Chardon cooling tower chemical treatment products can stay lively within the system even when it’s not circulating, but all biocides have a certain half-life and safety not often lasts more than a pair days. Critical consideration should be given to isolating secondary elements and draining them per the define above. If draining is just not attainable, program the vitality administration system to circulate water via off line parts twice daily in coordination with the biocide to help stop biofilm formation.

Controlling White Rust (Galvanic Corrosion) in Cooling Towers

What is White Rust? White rust is a white, waxy material that may accumulate on the galvanized surfaces of newer cooling towers. Galvanized sheet metallic naturally passivates with a protecting layer of zinc oxide. Chemically this passivation layer is a mixture of zinc hydroxide and zinc carbonate. It is crucial to control white rust immediately or extra in depth and damaging corrosion will occur. White rust varieties when galvanized steel is exposed to water with excess carbonate ions and a pH above eight.Three.

Special Purpose Induction Motor Of Cooling Tower - Buy Cooling Tower ...When did this drawback come up? Metal was historically galvanized using a “wetdip technique that promoted the event of the helpful zinc oxide passivation layer. New “drygalvanizing strategies were employed by tower manufacturers in the late 1980s which contain more aluminum in the method have made the formation of white rust extra possible.

What might be achieved? New galvanized cooling towers should be treated to take care of the pH of the circulating water under 8.3 for a interval of six to 9 months. It will make sure that the alkalinity of the tower water remains below the extent at which white rust kinds. Underneath these situations, galvanized surfaces kind a protecting layer of zinc carbonate which helps protect the steel beneath the galvanizing.

Also the mixture of low ph and phosphate based mostly chemicals can significantly reduce the time needed to correctly situation a brand new cooling tower (30 to 60 days relying on water
situations). The use of Chardon’s chemistry inhibits the manufacturing of excessive ranges of zinc carbonate, permitting the a natural oxide layer to type offering lengthy-time period safety.

What Chardon will do? Relying on the chemical characteristics of your make-up water, your Chardon Service Technician will alter the controller to function the system at decrease cycles of concentration and therefore decrease pH. This option will lead to a big improve in water consumption in the course of the passivation period. The alternative is to install an additional chemical pump which is able to periodically administer a solution of sulfuric acid to maintain the pH of the tower water below eight.Three. The sulfuric acid reacts with and neutralizes the natural alkalinity in the cooling tower water producing solely pure by-merchandise. After the six to 9 month therapy interval, your Chardon Consultant will have the ability to return your water remedy program to its regular working routine.

Alternatively, adjusting the system to lower cycles of focus and maintaining lower ph, the use of acid can be eradicated and exchange it with the suitable phosphate product. Sustaining a level of 300-four hundred ppm as PO4 for 30-60 days in the presence of 200-300 ppm of calcium hardness will enable the galvanized steel to properly passivate.

Some good causes to discharge tower bleed to sanitary sewers

Cooling tower treatment requires the controlled discharge from cooling towers and different recirculating water systems is designed to keep up a sure degree of water usage efficiency, or cycles of concentration. Evaporation causes the focus of naturally occurring dissolved solids in cooling tower water to be better than the water supply from which it began. The scrubbing effect water has on air pulled by way of the cooling tower to extend evaporation causes common, naturally occurring micro organism to become extra concentrated in cooling tower water. The safest and most environmentally accountable strategy to get rid of the controlled discharge of cooling tower water is to drain it to the sanitary sewer.

Sadly, many older systems had been designed to drain cooling tower water on to drainage tile fields, assortment ponds, ditches, creeks or different storm sewers. In 1987 the Environmental Safety Agency (EPA) enacted the Clean Water Act. With it got here the need for a permit below a process known as Nationwide Pollution Discharge Elimination System, or NPDES. The intent of this course of is to restrict and ultimately eliminate the discharge of “pollutantsto storm sewers and different floor water sources.

NPDES has confirmed to be a big expense to many companies with cooling towers. There are solely two choices: discharge tower water to a sanitary sewer to sewage treatment facility, or receive an NPDES permit. If cooling tower water just isn’t already discharged to a sanitary sewer, then plumbing the discharge to a suitable sewer is normally the best option. Only as a final resort should an NPDES permit be pursued.

For 2000, the EPA has enacted a number of necessary modifications to their NPDES program. Most are designed to tighten the requirements and make it more difficult for firms to acquire this EPA permit. Here’s a synopsis of the changes.

Your Chardon consultant will be glad to discuss these and other particulars of the NPDES program with you at your comfort. When you have any extra questions, please be happy to contact the Chardon Technical Support Staff.

Controlling Aluminum Corrosion in Cooling Tower Systems

What’s the problem with aluminum? Aluminum is light weight, easy to software and has been used in many industries for years. Sadly, aluminum has completely different solubility and corrosion resistance characteristics than most materials widespread to cooling towers and recirculating water techniques. Most water therapy methods are designed to handle corrosion and scaling considerations on a wide range of materials, however water chemistry that protects metals like steel and copper can current an aggressive scenario on aluminum. Aluminum is a very stable metal in dry air, but aluminum parts treated by recirculating water methods is one other matter.

So what is the solution? The corrosion price of aluminum increases when the pH of the water exceeds eight.0 and becomes severe when the pH exceeds 8.4. A treatment program designed to protect aluminum parts ought to maintain the pH of the water between 7.5 and 8.0. Sadly, this has an hostile effect on ferrous metals in the system. The corrosion charge of iron is elevated significantly on this neutral pH range. One should carefully weigh the advantages of a impartial pH program for programs constructed primarily of ferrous metals against the price of replacing aluminum components with plastic or brass items.

When the fee favors a neutral pH program designed to guard costly aluminum elements such a molds, acid should be used to keep up the pH of the water within the 7.5 8.0 range. Chardon cooling tower treatment might feed utilizing the inhibitor relay, though a controller capable of controlling based mostly on pH offers probably the most reliable resolution. For systems with accurate pH management, we will provide a specialised corrosion protection program and maintain the feed price between 1.0 and 1.5 ppm as zinc. Programs with softened make-up current an extra problem. The combination of low calcium hardness and low pH can considerably accelerate corrosion on ferrous metals. To forestall this mixture from corroding the system, mushy water can be blended with unsoften water to ship roughly one hundred ppm of calcium hardness in the system water.

What about automotive antifreeze for aluminum engine blocks? Silicate-based corrosion inhibitors will kind passivation films on aluminum and cut back corrosion, however these merchandise additionally type silica scale on heat exchangers. The effect of silica scale on heat switch is 9 times as great as calcium scale and this technology is rarely used in industrial functions.

Penalties of low circulation in cooling towers

What’s “low flowin a cooling tower? A cooling tower is designed to remove heat by evaporation of water. The tower is also designed to have a minimum and maximum amount of water movement over (or via) the tower’s “fill The fill within the tower is designed to extend the surface area of the water that may be uncovered to air. The larger the floor area of the water passing by way of the fill, the more efficient and quicker the heat switch to the ambiance. When the amount of water passing via the tower fill is lower than the designed minimum quantity, it is considered “low flow

Why would low circulate be a problem? Chardon understands that during normal operation of a cooling tower, the required evaporation will enhance the focus of the dissolved solids. Due to this fact, the recent water at the highest of the tower will improve in dissolved solids through the evaporation course of till it hits the bulk water in the sump of the tower. When the traditional amount of water is passing by way of the fill, the resulting focus of dissolved solids in the sump is usually negligible throughout a single pass. However, when less than the minimum amount of water is passing through the fill, the evaporation course of will nonetheless remove the identical amount of water from that low flow. The focus of the dissolved solids within the low move water will improve a lot faster. It may improve so rapidly that the present cooling tower therapy chemicals in the water will not be ready to keep the dissolved solids dissolved any longer and a few precipitation may happen!

How do I do know when a “low flowscenario exists? By inspection of the tower, normally the “hot decks(or distribution pans) are imagined to be filled to about one inch from the highest of the pan. If you happen to observe that the water degree in the new deck is way less than one inch from the highest of the pan, then you could have the problems talked about above. Typical towers normally have about four to six inches of water depth in the new deck. If the fan on the tower is working and you have low move, then the issue of over focus of dissolved solids is going to be more extreme.

How do I appropriate the low circulate? It’s best to confirm from the tower manufacturer the amount of designed water movement for that particular person tower. The tower manufacturer might have to know the orifice quantity to determine the traditional water depth in the new deck. If the water in the hot deck doesn’t approach the estimate of the tower producer, then notify the individual answerable for the facility of your findings. Some doable options are: open the balancing valves further, clean pump strainers, test valves that limit movement to the tower, clean rust chips from the balancing valves, and so on.

Mass Stability

What’s Mass Stability and why is it important to my cooling tower treatment program? Mass stability is a relationship between the quantity of chloride ions and the quantity of calcium ions in solution. The chloride ion is very soluble and is not going to precipitate even at excessive cooling tower situations. Under certain circumstances, the calcium ion will precipitate out of resolution and type calcium scale. By comparing the relative amounts of those two ions in solution, one can determine whether scale is accumulating or being removed. Chardon is one of only a few firms that understands the importance of this metric.

How does it work? Cycles of concentration is usually calculated by dividing the concentration of chlorides within the tower water by the focus of chlorides in the make-up water. The identical concept of cycles might be utilized to calcium hardness: divide the calcium hardness of the tower water by the calcium hardness of the make-up water. Mass balance is calculated by subtracting the worth for chlorides from the worth for calcium hardness, or MB = CaH Cl-.

What does it imply? Optimistic mass balance values point out that there is more c

Leave a Reply